In the Air

This trip we took advantage of our prior experience and connections to get the truck loaded and postioned in Mobile Alabama. Barry, our benefactor for this load, then flew us to Mobile where we met the truck and then continued to Mississippi. Everything went smooth and the timing was spot on, until we hit the 15 mile long traffic jam. One of the bridges was out and traffic had been rerouted to one lane. Very slow. This put us into the staging area late and forced us to spend the night in the truck. Oh well, everything was going too smoothly.

0 Comments:
Post a Comment
<< Home